Trammell Crow Company is moving forward with plans for a mixed-use hospitality and residential project known as Grapevine Village near the Grapevine Mills mall. The plan calls for three hotels and a 248-unit apartment component arranged across 11 residential buildings on a 28.7-acre site. The program positions hospitality as the anchor use, with a multifamily element integrated into the larger master-planned concept.
The proposed anchor property within Grapevine Village is a six-story Sandman Signature Hotel with 222 rooms. Across the full hospitality program, the three planned hotels are expected to total 750 rooms. The Sandman Signature is described as a full-service offering and is intended to serve as the focal point of the development.
Community Impact reports that the Sandman Signature Hotel will include a 275-seat full-service restaurant within the building. Plans call for the hotel to contain approximately 135,735 square feet, including a “Chop Steakhouse and Bar Restaurant,” as well as meeting space, a fitness center and an outdoor pool. The program also incorporates 4,000 square feet of banquet space to support meetings and events.
In addition to the Sandman Signature, the Grapevine Village plan includes two other hotels, which together will bring the total key count at the site to 750 rooms. Specific details about the brands, scale or positioning of the additional two hotels are not provided in the available information. The 248 planned apartments will be distributed among 11 buildings, but the mix of unit types and design details for the residential component have not been disclosed.
The project faced initial resistance at the local level. According to the report, the development was originally voted down before Trammell Crow revised its plans. After adjustments that were more acceptable to the town’s council, the proposal advanced, indicating that design and program changes were made to address community and municipal concerns. The specific nature of those modifications is not detailed, but the outcome suggests that the updated Grapevine Village concept better aligned with local priorities.
No information has been released on project costs, construction timing, delivery schedule or financing structure. The report does not identify current or prospective owners and operators for the hotels or the apartments, nor does it outline any leasing, management or branding agreements beyond the reference to the Sandman Signature flag and the planned on-site restaurant concept. Further details on capital structure, development timeline and tenant strategy have not yet been made public.


