Holualoa Companies is moving forward with plans to add a hotel component to its WaterView office campus in Phoenix’s Camelback Corridor, introducing a hospitality use alongside the existing Class A office environment. The company is proposing a 155-room Element by Marriott hotel that would be developed within the site, which is located at 2111 E. Highland Ave., just south of Camelback Road.
The planned hotel is described as a 96,600-square-foot, upscale extended-stay property that will be constructed on a portion of the existing parking area at the campus. As proposed, the hotel program includes a swimming pool, landscaped outdoor patios, guest seating areas and barbecue stations. Plans also call for pedestrian connections that link the hotel to the property’s lake and surrounding open spaces, integrating the hotel into the broader campus setting.
Holualoa acquired the roughly 12-acre property in December 2021, when it was still known as Park One. Since that acquisition, the firm has repositioned the asset under the WaterView name and undertaken a significant renovation initiative. In 2025, Holualoa completed a $10 million capital improvement program at the two-building, 209,000-square-foot office complex. The work included modernized office suites, upgraded lobbies and tenant amenity areas, as well as new outdoor features.
The renovation program delivered a lakeside boardwalk, a putting green and outdoor recreational facilities, extending the range of on-site amenities available to office tenants. These upgrades, combined with the proposed hotel, indicate a continued focus on enhancing the overall campus environment and its mix of uses.
The WaterView hotel proposal also fits within Holualoa’s broader hospitality activity in the Phoenix area. The company’s regional portfolio includes a 277-room, dual-branded AC Hotel and Element development at Norterra. In addition, Holualoa is involved with a 240-room, dual-branded Marriott property at CityNorth that is scheduled to open in December.
According to the filing timeline described by the company, preliminary plans for the Element at WaterView were submitted to the City of Phoenix in October. Pre-development activities for the hotel are expected to run through mid-2027, outlining a multiyear path from initial planning to potential construction. The proposed project would bring new extended-stay inventory to the Camelback Corridor while leveraging existing on-site open space and amenity infrastructure already in place at the WaterView campus.


