Search
Close this search box.

“New $185M Science & Tech Building Being Constructed at ASU”

"New $185M Science & Tech Building Being Constructed at ASU"

Arizona State University’s Polytechnic campus in Mesa is set to welcome a new addition in 2025 – the Science and Technology Building. This state-of-the-art facility will span three floors and cover an impressive 123,000 square feet, housing offices, meeting rooms, and cutting-edge labs focused on additive manufacturing, robotics, cyber manufacturing systems, semiconductor manufacturing systems,and energy production.

The building will serve as a central hub for engineering and technology education at ASU’s Polytechnic campus. It will be home to the School of Manufacturing Systems and Networks as well as the School of Engineering.

Designed by SmithGroup with construction led by McCarthy Building Cos., this groundbreaking project follows the successful completion of ISTB7 on ASU’s Tempe campus last year at a cost of $192 million.

Stay updated on all developments from Arizona State University by following Connect CRE.

Share the Post:

Related Posts